Construction Scheduling Manager
Company: Jones Bros. Contractors, LLC
Location: Mount Juliet
Posted on: February 13, 2026
|
|
|
Job Description:
Job Description Job Description Job Summary/Description Jones
Bros. Contractors, LLC (Jones Bros.) is seeking an experienced and
highly motivated Construction Scheduling Manager to support the
planning, coordination, and execution of both Alternative Delivery
and traditional Design-Bid-Build (DBB) heavy civil projects. The
Construction Scheduling Manager will develop, maintain, and analyze
CPM schedules throughout the project lifecycle-from early pursuit
and preconstruction phases through closeout-ensuring accurate
sequencing, resource planning, and risk management. This role works
closely with estimating, project management, engineering, design
partners, and field leadership to support diverse delivery methods
while maintaining production-focused schedules for roadway, bridge,
highway, utility, and other heavy civil infrastructure projects.
Duties & Responsibilities Develop detailed CPM schedules for both
Alternative Delivery (Design-Build, Progressive DB, CM/GC) and
traditional DBB projects, including earthwork, utilities, paving,
bridges, traffic control, staging, permitting, blasting, etc.
Support preconstruction and pursuit efforts with conceptual,
proposal, and baseline schedules that incorporate design
progression, production rates, resource allocation, and risk
mitigation strategies. Facilitate schedule coordination meetings
with project teams, design partners, subcontractors, and field
personnel. Maintain, update, and analyze schedules weekly and
monthly; identify variances, risks, or sequencing conflicts;
recommend corrective actions. Incorporate design changes,
clarifications, utility coordination, permitting requirements, and
environmental constraints into the schedule. Prepare milestone
charts, schedule narratives, dashboards, manpower/resource
histograms, and executive-level reports. Manage corporate asphalt
paving, equipment and staffing schedules. Conduct Time Impact
Analyses (TIA) or schedule-driven evaluations to support change
orders, delay claims, and contract modifications. Sequence major
civil operations including earthwork, rock excavation, embankments,
stormwater and utility installations, bridge substructures and
superstructures, and roadway surfacing. Develop traffic control and
phasing schedules aligned with DOT requirements, lane closures, and
seasonal/weather restrictions. Provide training and technical
support to project teams on CPM scheduling, Primavera P6 usage, and
scheduling best practices across multiple delivery methods. Ensure
compliance with company scheduling standards, DOT/owner
requirements, and Alternative Delivery contracting guidelines.
Participate in owner meetings, design coordination sessions, and
partnering workshops as needed. Required Skills & Abilities Must be
able to work onsite at our Mt. Juliet, TN office Monday through
Friday; this is a full-time, in-office position. Deep understanding
of heavy civil construction methods, including: Earthwork, mass
grading, rock excavation Stormwater, sanitary, and waterline
utilities Bridge foundations, substructure & superstructure.
Asphalt paving, stabilization, and surfacing Traffic control
planning and phasing Demonstrated experience supporting both
Alternative Delivery (Design-Build, Progressive DB, CM/GC) and
traditional DBB projects. Expert proficiency in Primavera P6,
including resource and cost loading, logic creation, and critical
path analysis. Knowledge of DOT/FHWA specifications, milestones,
incentive/disincentive structures, and schedule compliance
requirements. Ability to read and interpret civil drawings,
cross-sections, profiles, MOT plans, and geotechnical reports.
Strong analytical, organizational, and communication skills; able
to collaborate with field teams and design partners. Ability to
manage multiple schedules and priorities while maintaining
high-quality deliverables. Proficiency with Microsoft Office Suite
(Excel, Word, PowerPoint, Projects); familiarity with model-based
scheduling or collaborative design tools is a plus. Education and
Experience Bachelor's degree in Construction Management, Civil
Engineering, or related field preferred; equivalent experience
considered. 3-5 years of CPM scheduling experience in heavy civil
construction. Experience with both Alternative Delivery and
traditional Design-Bid-Build projects strongly preferred. DOT
transportation project experience (highways, bridges, civil
infrastructure) highly desirable. Experience preparing TIAs, delay
analyses, or claims support preferred. Physical Requirements
Occasional travel to jobsites, design partner offices, coordination
meetings, and company events (5%–10%). Ability to walk uneven
terrain on active civil construction sites. Extended periods of
sitting, computer work, or design review in an office environment.
Flexible schedule allowing for occasional early mornings, evening
work, or weekend responsibilities tied to project deadlines or
delivery requirements. Equal Opportunity Employment It is the
policy of this Company to assure that applicants are employed, and
that employees are treated during employment, without regard to
their race, color, religion, national origin, age, sex, disability,
or veteran status. Such actions shall include employment,
upgrading, demotion or transfer; recruitment or recruitment
advertising; layoff or termination; rates of pay or other forms of
compensation; and selection for training, including apprenticeship,
pre-apprenticeship and/or on-the-job training. We encourage current
employees and future employees to recruit interested applicants to
apply regardless of race, color, religion, national origin, age,
sex, disability, or veteran status. We are an Equal Opportunity
Employer and a TN Drug-Free Workplace.
Keywords: Jones Bros. Contractors, LLC, Nashville , Construction Scheduling Manager, Construction , Mount Juliet, Tennessee